摘要
高层住宅建筑越来越多,给排水工程作为主体施工阶段重要的预埋预留配合工序,虽然并不会严重影响到建筑主体的质量安全,但会影响到未来居住者的使用。所以,为了能够确保后期居住用户的顺利入住和使用,相关监理人员一定要严格管控该阶段给排水工程各施工环节的每项工作,才能够确保完成工程建设既定的质量功能目标。本文分析了高层住宅主体施工阶段给排水施工现状,对施工原则、标准、技术等进行了阐述,提出了高层住宅主体施工阶段给排水工程的监理控制要点,以供参考。
In the context of more and more high-rise residential buildings,water supply and drainage engineering,as an important embedded reservation and cooperation process in the main construction stage,will not seriously affect the quality and safety of the main building,but will affect the use of future residents.Therefore,in order to ensure the smooth occupancy and use of residential users in the later stage,the relevant supervisors must strictly control each work of each construction link of the water supply and drainage project in this stage,so as to ensure the completion of the established quality and function objectives of the project construction.By analyzing the current situation of water supply and drainage construction in the main construction stage of high-rise residential buildings,this paper expounds the construction principles,standards and technologies,and puts forward the key supervision and control points of water supply and drainage engineering in the main construction stage of high-rise residential buildings for reference.
出处
《住宅产业》
2022年第7期81-83,共3页
Housing Industry
关键词
高层建筑
给排水施工
现状分析
监理控制
high rise building
water supply and drainage construction
current situation analysis
supervision and control