期刊文献+

太湖流域骨干工程联合调度效果分析--以望虞河、走马塘工程为例 被引量:2

Analysis of joint dispatching effects of key projects in Taihu Lake watershed
下载PDF
导出
摘要 以太湖流域现状工程为基础,针对流域、区域、地区不同目标的调度需求,对骨干工程望虞河、走马塘工程及周边控制线主要控制建筑物设计不同的工程运行调度方案,利用成熟的数值模拟计算技术,模拟计算1971年典型降雨条件下,分析各调度方案对多目标的响应情况,对比分析确定最优调度方案,发挥工程综合效益化,为工程调度运行实践提供参考。 Based on the existing projects in Taihu Lake watershed,in view of the different dispatching objectives of river basin,various regions and districts,different operation regulating schemes were designed for the key projects such as Wangyu River project,Zoumatang project and surrounding control buildings.Mature numerical simulation technology was used to analyze the response of various dispatching schemes to multiple objectives under the typical rainfall conditions in 1971.The optimum dispatching scheme was determined based on comparison and analysis to bring into full play the comprehensive benefits of project.
作者 廖志盛 马农乐 薛宣 LIAO Zhi-sheng;MA Nong-le;XUE Xuan(Zhanjiang Branch of Guangzhou Huashen Construction Engineering Management Co.,Ltd..,Zhanjiang 524037,China;Shanghai Dongnan Engineering Consultant Co.,Ltd.,Shanghai 200434,China)
出处 《广西水利水电》 2022年第4期33-38,共6页 Guangxi Water Resources & Hydropower Engineering
关键词 多目标联合调度 数值模拟 效益 望虞河 走马塘 太湖流域 Multi-objective joint dispatching numerical simulation benefit Wangyu River Zoumatang Taihu Lake watershed
  • 相关文献

同被引文献6

引证文献2

二级引证文献4

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部