龙滩水电站2020年汛期调蓄影响分析

Analysis of flood regulation and storage impact of Longtan Hydropower Station in flood season of 2020
下载PDF
导出
摘要 龙滩水电站是红水河开发的骨干控制性水利工程,具有调度、防洪、发电、航运等综合利用效益。分析2020年汛期龙滩水电站3次洪水过程中对西江流域的拦洪调蓄影响,削峰率分别达到了93%、61%、90.1%,实现了拦洪错峰、减轻西江中下游防洪压力以及保证枯季珠江水量调度、洪水资源化的作用,为西江流域防灾减灾提供数据分析,同时也能为下游梯级电站的优化调度实施打下基础。 Longtan Hydropower Station is the key control water conservancy project of Hongshui River incorporating comprehensive benefits of dispatch,flood control,power generation and navigation.Analysis was made on the flood regulation and storage impact of Longtan Hydropower Station for Xijiang River basin during the three times of floods occurred in the flood season of 2020.The peak clipping rates reached 93%,61%and 90.1%respectively.Longtan Hydropower Station realized its function of flood detention and peak shifting,alleviated the flood control pressure in the middle and lower reaches of Xijiang River,ensured the water regulation and flood resources utilization in the Pearl River in dry season.The results of analysis provide data for flood control and disaster alleviation in Xijiang River basin,and also lay a foundation for the optimal operation of downstream cascades of hydropower stations.
作者 黄玉丹 HUANG Yu-dan(Hydrology Center of Hechi City,Hechi 547000,China)
机构地区 河池水文中心
出处 《广西水利水电》 2022年第4期48-52,共5页 Guangxi Water Resources & Hydropower Engineering
关键词 拦洪调蓄 削峰率 防洪减灾 优化调度 龙滩水电站 Flood regulation and storage peak clipping rate flood control and disaster alleviation optimal operation Longtan Hydropower Station
  • 相关文献

参考文献4

二级参考文献16

共引文献8

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部