米山煤业15103工作面水力压裂坚硬顶板技术研究 被引量:1

Study on Hard Roof Technology of Hydraulic Fracturing in the 15103 Working Face of Mishan Coal Mine
下载PDF
导出
摘要 针对米山煤业山15煤层回采顶板岩层不易垮落的问题,采用水力压裂的方法进行处理。在回采巷道采帮侧施工压裂钻孔,其中运输巷布置A类钻孔和C类钻孔,回风巷布置B类钻孔和D类钻孔。现场监测结果显示:工作面回采过程中顶板岩层能够及时垮落,达到了预期的目的。 In view of the problem that the mining roof strata are not easy to collapse in the 15coal seam of Mishan Coal Industry,the method of hydraulic fracturing is adopted to deal with it.Fracturing boreholes are constructed on the side of the mining side of the mining roadway,in which type A and type C boreholes are arranged in the transport roadway,type B and type D boreholes are arranged in the return air roadway.The on-site monitoring results show that the roof strata can collapse in time during the mining process of the working face.The expected goal has been achieved.
作者 王进海 Wang Jinhai(Shanxi Gaoping Kexing Mishan Coal Industry Co.,Ltd.,Shanxi Gaoping 048400)
出处 《山东煤炭科技》 2022年第7期64-66,69,共4页 Shandong Coal Science and Technology
关键词 采煤 顶板 水力 压裂 coal mining roof hydraulic power fracturing
  • 相关文献

参考文献5

二级参考文献45

共引文献18

同被引文献3

引证文献1

二级引证文献2

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部