期刊文献+

Real-time analysis and prediction of shield cutterhead torque using optimized gated recurrent unit neural network 被引量:8

下载PDF
导出
摘要 An accurate prediction of earth pressure balance(EPB)shield moving performance is important to ensure the safety tunnel excavation.A hybrid model is developed based on the particle swarm optimization(PSO)and gated recurrent unit(GRU)neural network.PSO is utilized to assign the optimal hyperparameters of GRU neural network.There are mainly four steps:data collection and processing,hybrid model establishment,model performance evaluation and correlation analysis.The developed model provides an alternative to tackle with time-series data of tunnel project.Apart from that,a novel framework about model application is performed to provide guidelines in practice.A tunnel project is utilized to evaluate the performance of proposed hybrid model.Results indicate that geological and construction variables are significant to the model performance.Correlation analysis shows that construction variables(main thrust and foam liquid volume)display the highest correlation with the cutterhead torque(CHT).This work provides a feasible and applicable alternative way to estimate the performance of shield tunneling.
出处 《Journal of Rock Mechanics and Geotechnical Engineering》 SCIE CSCD 2022年第4期1232-1240,共9页 岩石力学与岩土工程学报(英文版)
基金 funded by“The Pearl River Talent Recruitment Program”of Guangdong Province in 2019(Grant No.2019CX01G338) the Research Funding of Shantou University for New Faculty Member(Grant No.NTF19024-2019).
  • 相关文献

参考文献12

二级参考文献53

  • 1Rohola Hasanpour,Jamal Rostami,Jürgen Schmitt,Yilmaz Ozcelik,Babak Sohrabian.Prediction of TBM jamming risk in squeezing grounds using Bayesian and artificial neural networks[J].Journal of Rock Mechanics and Geotechnical Engineering,2020,12(1):21-31. 被引量:13
  • 2吕强,傅德明.土压平衡盾构掘进机刀盘扭矩模拟试验研究[J].岩石力学与工程学报,2006,25(z1):3137-3143. 被引量:58
  • 3龚秋明,赵坚,张喜虎.岩石隧道掘进机的施工预测模型[J].岩石力学与工程学报,2004,23(z2):4709-4714. 被引量:42
  • 4朱永全,景诗庭,张清.时间序列分析在隧道施工监测中的应用[J].岩石力学与工程学报,1996,15(4):353-359. 被引量:47
  • 5日本土木工程学会 朱伟译.隧道标准规范(盾构篇)及解说[M].北京:中国建筑工业出版社,2001..
  • 6Sanio H E Prediction of the performance of disc cutters in anisotropic rock[J]. Int. J. of Rock Mech. and Mining Sci. and Geomech. Abs.,1985, 22(3): 153-161.
  • 7Roxborough F F, Phillips H R. Rock excavation by disc cutter[J]. Int.J. of Rock Mech. and Mining Sci. and Geomech. Abs., 1975, 12:361-365.
  • 8Copur H, Rostami J, Ozdemir L, et al. Studies on performance prediction of roadheaders based on field data in mining and tunneling projects[A]. In: Int. the 4th Mine Mechanization and Automation Symp[C]. Brisbane, Australia: [s. n.], 1997. 1-7.
  • 9Rostami R, Ozdemir L, Nilson B. Comparison between CSM and NTH Hard Rock TBM Performance Prediction Models[M]. Las Vegas, NV: Isdt., 1996.
  • 10Maidl B, Herrenknecht M, Anheuser L. Mechanized Shield Tunnelling[M]. Berlin: Ernst and John, 1996. 221-225.

共引文献231

同被引文献97

引证文献8

二级引证文献6

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部