徐韩公路快速化改造工程采用整体式、后浇带式及上/下分层式等预制盖梁施工工艺。工程针对节段预制盖梁,建立标准化工厂预制及现场拼装流程,提出了工厂预制质量控制措施、常见质量病害及处置措施,形成成品运输、临时支墩搭设、吊装就位、现浇段施工及临时支墩拆除等拼装全过程的技术要求。最终,还制定了工厂预制及现场拼装的质量检验与验收标准。
The construction technology of prefabricated capping beams such as integral type,post-cast belt type&upper/lower layered type is adopted in the rapid reconstruction project of Xuhan Highway.For segmental precast capping beams,the project establishes a standardized factory prefabrication and field assembly process,puts forward factory prefabrication quality control measures,common quality diseases&treatment measures,and forms technical requirements for the whole process of assembly such as finished product transportation,temporary pier erection,hoisting in place,cast-in-situ section construction&temporary pier removal.Finally,the quality inspection&acceptance standards for factory prefabrication&on-site assembly are formulated.
作者
张基成
冯晓楠
刘朵
沈成忠
ZHANG Ji-cheng;FENG Xiao-nan;LIU Duo;SHEN Cheng-zhong(Xuzhou Highway Development Center,Xuzhou 221006,China;JSTI Group Co.,Ltd.,Nanjing 211112,China;Wuxi Dacheng Construction Co.,Ltd.,Wuxi 211200,China)
出处
《中国市政工程》
2022年第4期94-98,128,129,共7页
China Municipal Engineering
关键词
节段预制
上下分层式
盖梁
质量控制
检查验收
segmental prefabrication
upper&lower layered type
capping beam
quality control
inspection&acceptance