现状泖港大桥因航道升级、道路拓宽、桥梁更新需要改建。结合工程背景、建设条件,对老桥顶升保留和拆除重建的总体方案进行比选后,推荐采用拆除重建。介绍工程总体设计方案,总结单索面宽幅斜拉桥体系、塔梁固结斜拉桥支座体系、UHPC+钢组合桥面板、钢梁挑臂后拼工艺、大跨径混凝土斜拉桥拆除等关键技术,可为类似桥梁工程建设提供参考。
The current Maogang Bridge needs to be rebuilt due to channel upgrading,road widening&bridge renewal.In combination with the project background&construction conditions,after comparing&selecting the overall schemes of the old bridge jacking retention,demolition&reconstruction,it is recommended to adopt demo lition&reconstruction.The overall design scheme of the project is introduced,and the key technologies such as single cable plane wide cable-stayed bridge system,tower beam consolidation cable-stayed bridge support system,UHPC+steel composite bridge deck,steel beam cantilever post-prefabricated process,and large-span concrete cable-stayed bridge demolition are summarized,which can provide reference for similar bridge construction.
作者
鄢余文
阮杰
YAN Yu-wen;RUAN Jie(Shanghai Municipal Engineering Design InstituteCo.,Ltd.,Shanghai 200092,China)
出处
《中国市政工程》
2022年第4期112-116,130,共6页
China Municipal Engineering
关键词
平申线航道
泖港大桥
双塔单索面斜拉桥
UHPC+钢组合桥面板
斜拉桥拆除
Pingshen line channel
Maogang Bridge
double tower single cable plane cable-stayed bridge
UHPC+steel composite bridge deck
demolition of cable-stayed bridge