摘要
0n March 25,employees of Nantong C0SCO Khi Ship Engineering(NACKS)hurried 10 the oufitting dock in the rain to see off the 125th 61.00DWT bulk carrier.w hat does it mean compleing and delivering more than 100 ships of the same type within 8 years?
出处
《船舶经济贸易》
2022年第4期63-66,共4页
Ship Economy & Trade