斯里兰卡KMTC输水隧洞湿喷混凝土施工方法

Construction Method of Wet Shotcrete for KMTC Water Conveyance Tunnel in Sri Lanka
下载PDF
导出
摘要 以斯里兰卡KMTC输水隧洞工程为例,以初次喷和永久喷为施工特色,依据湿喷混凝土设计原理和工艺流程,介绍湿喷混凝土施工技术的操作方法和质量控制并简述本工程在施工过程中遇到的重点及难点。二者的有机结合,有利于保障劳动者身体健康,有利于加快整体施工进度,有利于提高经济效益。该施工技术工艺好,效果好,质量好。 Taking KMTC water conveyance tunnel project in Sri Lanka as an example,this paper takes initial and permanent spraying as construction characteristics,introduces the operation method and quality control of wet spraying concrete construction technology according to the design principle and process of wet spraying concrete,and briefly describes the key and difficult points encountered in the construction process of this project.The organic combination of the two is conducive to safeguarding the health of workers,accelerating the overall construction progress and improving economic benefits.The construction technology has good technology,effect and quality.
作者 杨涛 张宇 YANG Tao;ZHANG Yu(POWERCHINA SINOHYDRO ENGINEERING BUREAU 14 CO.,LTD.,Kunming 650041,China)
出处 《云南水力发电》 2022年第S02期47-50,共4页 Yunnan Water Power
关键词 长距离输水隧洞 湿喷混凝土 施工难点 质量控制 long-distance water conveyance tunnel wet shotcrete construction difficulties quality control
  • 相关文献

参考文献5

二级参考文献6

共引文献8

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部