摘要
列控系统由车载ATP、车载ATO、ATS、ZC、CI、仿真测试环境等各个产品组成,各个产品都以列控数据作为支撑。针对列控系统数据配置的需求,建立列控设备数据模型。通过对列控数据可视化、数据生成、数据转换途径的研究,实现列控系统数据配置功能。列控数据配置系统在工程设计平面图基础上,生产多种列控系统产品的数据,能够有效地提高列控信号系统产品集成的能力。
The train control system consists of onboard ATP,onboard ATO,ATS,ZC,CI,simulation test environment and other products,all of which are supported by train control data.According to the requirements of data configuration of train control system,a train control equipment model is established.Trough the research of train control data visualization,data generation and data conversion,the data confi guration function of train control system is realized.Based on the urban rail design plan,the train control data confi guration system can produce data of various train control system products,which can eff ectively improve the capability of train control signaling system product integration.
作者
赵安安
Zhao Anan(CRSC Urban Rail Transit Technology Co.,Ltd.,Beijing 100070,China)
出处
《铁路通信信号工程技术》
2022年第8期78-81,共4页
Railway Signalling & Communication Engineering
关键词
列控数据
信号系统
数据支撑
数据转换
train control data
signaling system
data support
data conversion