期刊文献+

装配式墙板正交组合定位吊装施工技术 被引量:5

Orthogonal Combination Positioning and Hoisting Construction Technology of Prefabricated Wall Panels
下载PDF
导出
摘要 装配式墙板安装作为装配式建筑施工过程中的重要环节,直接决定装配式建筑的质量。为提高装配式墙板安装精度及效率,降低安全事故发生率,提出一种装配式墙板正交组合定位吊装施工技术。通过分析背景工程施工重难点,详细介绍了预制墙板定位放线、定位工具放线、定位工具固定、预制墙板吊装就位、拆除定位工具、预制墙板固定等施工工艺。该技术可有效提高装配式墙板安装的精度及效率,同时降低传统装配式墙板施工过程中的安全隐患。 As an important link in the construction process of prefabricated buildings,the installation of prefabricated wall panels directly determines the quality of prefabricated buildings.In order to improve the installation accuracy and efficiency of prefabricated wall panels and reduce the incidence of safety accidents,an orthogonal combination positioning and hoisting construction technology of prefabricated wall panels is proposed.By analyzing the background engineering construction difficulties,the prefabricated wall panels positioning and laying out,positioning tool laying out and fixation,prefabricated wall panels hoisting in place,removal of positioning tools,prefabricated wall panels fixation are introduced in detail.This technology can effectively improve the accuracy and efficiency of the installation of prefabricated wall panels,and at the same time reduce the hidden safety hazards in the construction process of traditional prefabricated wall panels.
作者 韩丽丽 HAN Lili(Qingdao Construction Engineering Management Service Center,Qingdao,Shandong266071,China)
出处 《施工技术(中英文)》 CAS 2022年第16期86-89,共4页 Construction Technology
关键词 安装工程 装配式 预制墙板 吊装 正交组合 施工技术 installation prefabricated prefabricated wall panels hoisting orthogonal combination construction
  • 相关文献

参考文献9

二级参考文献29

共引文献86

同被引文献46

引证文献5

二级引证文献2

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部