期刊文献+

中国二重镇江出海口基地百万千瓦级核岛主设备制造的规划方案

The Planning Scheme for Million Kilowatt Nuclear Island Main Equipment of Zhenjiang Port Base of China Erzhong
下载PDF
导出
摘要 简述了百万千瓦级核电主设备制造基地规划建设的项目选址、产品及生产规模、总体布局、主要子项等关键内容,对包括核电容器厂房、成套装备厂房、安全壳及设备模块厂房及重件码头在内的主要子项进行了详细的工艺方案规划。 In this paper,the project site selection,products and production scale,overall layout,main sub-item and other key contents of the planning and construction of the main equipment manufacturing base of million kilowatts nuclear power plant we briefly described.The detailed process scheme is carried out for the main sub items including nuclear capacitor plant,complete equipment plant,containment and equipment module plant and heavy cargo wharf.
作者 周烨明 郭杭锋 ZHOU Ye-ming;GUO Hang-feng(China United Engineering Corporation Limited Hangzhou 310052,China)
出处 《工程建设与设计》 2022年第15期7-10,共4页 Construction & Design for Engineering
关键词 百万千瓦级 核岛主设备 制造 规划方案 million kilowatts nuclear island main equipment manufacture planning scheme
  • 相关文献

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部