雄安新区的基础建设应符合“数字雄安”基建标准。以此为基础,论文以启动区C组支线综合管廊项目为例,分析了项目在施工阶段遇到的项目体量大、工期紧张、施工工艺交底困难、工程量优化欠缺、各参与方管理困难等施工难点。并以此为出发点,介绍BIM技术在本项目中的具体应用,将各施工信息上传至雄安建设管理平台,进行施工信息的综合管控。
Xiong’an New Area infrastructure should comply with the"digital Xiong’an"construction standards,based on this,this paper takes the start zone group C regional comprehensive utility tunnel project as an example,analyzes the construction difficulties encountered in the construction phase of the project,such as large project volume,tight construction period,difficult disclosure of construction technology,lack of engineering quantity optimization,and difficulties in management of all participants.Taking this as the starting point,the specific application of BIM technology in the project is introduced,and all construction information is uploaded to the Xiongan Construction management platform for comprehensive control of construction information.
作者
兰宁博
LAN Ning-bo(China Railway First Bureau Group Co.Ltd.,Xi'an 710054,China)
出处
《工程建设与设计》
2022年第15期197-200,共4页
Construction & Design for Engineering
关键词
基建标准
BIM技术
综合管廊
可视化
infrastructure standard
BIM technology
integrated pipe gallery
visualization