摘要
针对沙漠边缘地带这一特殊的地理环境,以内蒙古某风电场为例,分析了在该类区域进行风力发电工程建设所面临的特殊气象条件、地质特性和风沙危害等不利因素,对工程建设面临的重难点进行了研究和总结,提出了应对措施和新技术发展方向。
In view of the special geographical environment of desert fringe,taking a wind power generation in Inner Mongolia as an example,this paper analyzes the adverse factors such as special meteorological conditions,geological characteristics and wind sand hazards faced by the construction of wind power generation project in this kind of area,studies and summarizes the key and difficult points faced by the project construction,and puts forward countermeasures and the development direction of new technology.
作者
祁林攀
王佳
王健
宋棋芃
QI Lin-pan;WANG Jia;WANG Jian;SONG Qi-peng(Northwest Engineering Corporation Limited,PowerChina,Xi'an 710065,China)
出处
《工程建设与设计》
2022年第15期237-240,共4页
Construction & Design for Engineering
关键词
沙漠边缘地带
风力发电
工程建设
desert fringe
wind power generation
engineering construction