摘要
隧洞超前地质预报可由施工单位实施,也可由建设单位单独委托第三方专业机构实施,文章结合滇中引水工程超前地质预报工作管理实践,分析了两种实施方式的异同点,提出了专项超前地质预报工作管理的要点及方法,为类似项目提供借鉴和参考。
Tunnel advance geological forecast can be implemented by the construction unit,which also can be implemented by the third party professional organizationentrusted by the construction unit alone.The advance geological forecast work management practice of the Central Yunnan Water Diversion Project is combined in the paper.The similarities and differences among the two implementations modes are analyzed.Key points and methods of advance geological forecast work management are proposed,thereby providing reference for similar projects.
作者
李俊伟
LI Junwei(Yunnan Province Central Yunnan Water Diversion Engineering Co.,Ltd.,Kunming 650051,China)
出处
《中国水能及电气化》
2022年第8期30-33,共4页
China Water Power & Electrification
关键词
滇中引水工程
超前地质预报
实施模式
Central Yunnan Water Diversion Project
advanced geological forecast
implementation mode