隧洞超前地质预报实施模式探讨

Discussion on Implementation Model of Tunnel Advanced Geological Forecast
下载PDF
导出
摘要 隧洞超前地质预报可由施工单位实施,也可由建设单位单独委托第三方专业机构实施,文章结合滇中引水工程超前地质预报工作管理实践,分析了两种实施方式的异同点,提出了专项超前地质预报工作管理的要点及方法,为类似项目提供借鉴和参考。 Tunnel advance geological forecast can be implemented by the construction unit,which also can be implemented by the third party professional organizationentrusted by the construction unit alone.The advance geological forecast work management practice of the Central Yunnan Water Diversion Project is combined in the paper.The similarities and differences among the two implementations modes are analyzed.Key points and methods of advance geological forecast work management are proposed,thereby providing reference for similar projects.
作者 李俊伟 LI Junwei(Yunnan Province Central Yunnan Water Diversion Engineering Co.,Ltd.,Kunming 650051,China)
出处 《中国水能及电气化》 2022年第8期30-33,共4页 China Water Power & Electrification
关键词 滇中引水工程 超前地质预报 实施模式 Central Yunnan Water Diversion Project advanced geological forecast implementation mode
  • 相关文献

参考文献3

二级参考文献13

共引文献4

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部