摘要
梳理分析衢州东站现状及存在问题,通过研究运输服务企业以及路网变化,预测5年后衢州东站货运疏解作业量,提出了衢州东北侧增加到发线、衢州东南侧增加到发线、延长存车线、新建元立铁路专用线、巨化铁路专用线电气化改造等5个方案,对方案的优缺点进行分析,从能力适应性、工程投资、工程实施难度、安全风险等维度提出采用新建元立铁路专用线方案,为既有作业条件困难的技术站改造提供了新的思路和建议。
This paper analyzed the current situation and problems of Quzhoudong Railway Station. By studying the changes in transportation service enterprises and railway networks, it predicted the workload of freight relief of Quzhoudong Railway Station in five years and put forward five schemes. The schemes include adding the arrival and departure track to the north of Quzhoudong Station, adding the arrival and departure track to the south of Quzhoudong Station, extending the storage line of Quzhoudong Station,building the special line of Yuanli Railway, and electrification transformation of the special line of Juhua railway. The advantages and disadvantages of the schemes were analyzed, and the scheme of the new Yuanli special line was proposed from the aspects of capacity adaptability, project investment,engineering implementation difficulty, and safety risk. These schemes provide new ideas and suggestions for the reconstruction of technical stations with difficult operation conditions.
作者
徐洋
金国
陈阵
杨建峰
XU Yang;JIN Guo;CHEN Zhen;YANG Jianfeng(Traffic Control Center,China State Railway Group Co.,Ltd.,Beijing 100844,China;Quzhou Rail Transit Construction Management Center,Quzhou 324000,Zhejiang,China;Transportation Department,China Railway Shenyang Group Co.,Ltd.,Shenyang 110000,Liaoning,China;Traffic Control Office,China Railway Urumqi Group Co.,Ltd.,Urumqi 830000,Xingjiang,China)
出处
《铁道货运》
2022年第7期1-7,共7页
Railway Freight Transport
基金
中国国家铁路集团有限公司科技研究开发计划课题(K2018X012)。
关键词
衢州东站
运输能力
提升方案
改造
运量
Quzhoudong Railway Station
Transportation Capacity
Elevation Scheme
Reconstruction
Freight Volume