双级摇臂大采高短壁采煤机设计方案探讨

Discussion on the Design Scheme of Two-stage Rocker Arm Short Wall Shearer with Large Mining Height
下载PDF
导出
摘要 为增大单滚筒短壁采煤机的开采高度,通过对现有短壁采煤机的结构特点分析研究,结合单、双滚筒采煤机技术特点,提出了双级摇臂大采高短壁采煤机的总体设计方案,并对其核心系统设计方案及开采工艺进行了介绍。 In order to increase the mining height of the single drum short wall shearer,through the analysis and research on the structural characteristics of the existing short wall shearer,combined with the technical characteristics of the single and double drum shearers,the overall design scheme of the two-stage rocker arm high mining height short wall shearer was put forward,and its core system design scheme and mining technology were introduced.
作者 胡璟 HU Jing(CCTEG Shanghai Research Institute,Shanghai 200030,China;Tiandi Shanghai Mining Equipment Technology Co.,Ltd.,Shanghai 200030,China)
出处 《煤矿机电》 2022年第2期66-68,73,共4页 Colliery Mechanical & Electrical Technology
基金 天地科技股份有限公司科技创新创业资金专项重点项目(2020-TD-ZD016)。
关键词 单滚筒 双级摇臂 短壁采煤机 single drum two-stage rocker arm shortwall shearer