联合循环机组启动阶段协调控制浅析

Analysis on Coordinated Control of Combined Cycle Unit in Startup Stage
下载PDF
导出
摘要 介绍了申能临港燃机发电有限公司西门子SGT5-4000F联合循环机组在启动阶段的协调控制及高旁压力、余热锅炉对燃机升负荷的限制,并对两起启动阶段升负荷异常案例进行了分析,希望为同类型机组控制逻辑分析、异常事件判断提供借鉴与帮助。 Coordinated control mode of Siemens SGT5-4000F combined cycle unit in start-up stage is introduced,HP bypass control mode in the startup stage and the influence of relevant parameters of HRSG on the load rise limit of gas turbine is described in detail.Finally,two cases of abnormal load rise in the startup stage of unit are analyzed,which provides reference and helps for the control logic analysis and abnormal event judgment of the same type of units.
作者 杜闻捷 DU Wenjie(Shanghai Shenergy Lingang CCGT Power Generation Co.,Ltd.)
出处 《上海节能》 2022年第8期1039-1045,共7页 Shanghai Energy Saving
关键词 协调控制方式 燃机控制模式 高旁压力控制模式 燃机升负荷限制 Coordinated Control Mode Gas Turbine Control Mode HP Bypass Control Mode Load Rise Limit of Gas Turbine
  • 相关文献

参考文献4

二级参考文献31

共引文献8

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部