摘要
随着《南京市生活垃圾管理条例》的正式实施,南京市已进入垃圾强制分类的新时代,但大件垃圾末端处置中心不健全的现象比较严重。本文介绍了南京市某区大件垃圾资源化处置中心的工程设计。该工程为规划建设、手续齐全的区级大件垃圾资源化处理中心,其设计、建设经验可以为其他大件垃圾处理和资源化项目提供参考。
With the official implementation of the"Nanjing Municipal Waste Management Regulations",Nanjing has entered a new era of compulsory garbage classification,but the phenomenon of the unsound end-of-life bulky waste disposal center is relatively serious.This paper introduces the engineering design of a bulky waste recycling center in a district of Nanjing.The project is a district-level bulky waste recycling center with complete planning and construction procedures,its design and construction experience can provide reference for other bulky waste treatment and recycling projects.
作者
闫婷婷
袁玮良
马祥
YAN Tingting;YUAN Weiliang;MA Xiang(Jiangsu Branch of North China Municipal Engineering Design&Research Institute Co.,Ltd.,Nanjing 210019,China)
出处
《中国资源综合利用》
2022年第8期102-104,共3页
China Resources Comprehensive Utilization
关键词
大件垃圾
工程设计
资源化
bulky waste
engineering design
resource utilization