摘要
五星级酒店的供配电系统设计工作是比较复杂的,具有一定的设计难度。本文从负荷等级、供电方式、变压器容量、柴油发电机容量的确定等几方面进行研究,最终确定了供电方案。供电方案的设计不仅满足了酒店管理公司的运营要求,同时也满足国家规范的要求。
The design work of the power supply and distribution system of the five-star hotel is relatively complicated and has certain design difficulties.This paper studies the load level,power supply mode,transformer capacity,determination of diesel generator capacity,etc.,and finally determines the power supply scheme.The design of the power supply scheme not only meets the operational requirements of the hotel management company,but also meets the requirements of national regulations.
作者
马壮
MA Zhuang(Anhui Wuwei Architectural Planning&Design Co.,Ltd.,Hefei 230001,China)
出处
《价值工程》
2022年第25期95-97,共3页
Value Engineering