基于过程监理的弹簧隔振器安装质量控制

Quality Control of Spring Isolator Installation Based on Process Supervision
下载PDF
导出
摘要 平山电厂二期工程为“国家示范工程”,是目前全球单机运行功率最大的燃煤发电机组。以世界首台1350 MW机组汽轮发电机基座隔振弹簧安装为例,总结了超大容量机组汽轮发电机基座施工过程中弹簧隔振器安装监理要点及注意事项,可供国内同类工程参考借鉴。 The second phase project of Pingshan power plant is a"national demonstration project",and it is the largest coal-fired unit in the world.Taking the installation of vibration isolation spring on steam turbine base of the world's first 1350 MW unit as an example,the main points and precautions of spring vibration isolator installation supervision during the construction of the turbo-generator base of the super-capacity unit are summarized,which can be used as a reference for similar projects in China.
作者 王钊 高明坤 WANG Zhao;GAO Mingkun(Shandong Chengxin Engineering Construction Supervision Co.,Ltd.,Jinan 250101,China)
出处 《电工技术》 2022年第14期172-174,共3页 Electric Engineering
关键词 汽轮发电机基座 隔振器 监理 质量控制 释放 turbine base vibration isolator supervisor quality control release
  • 相关文献

参考文献5

二级参考文献8

共引文献2

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部