期刊文献+

再生铅企业原料处理工艺改进方案论述 被引量:1

Discussion on Improvement Scheme of Raw Material Processing Technology in Lead Recycling Enterprise
下载PDF
导出
摘要 某再生铅企业主要对周边冶炼企业产生的含铅烟灰、铅泥等含铅废渣进行回收利用,由于上游产业技术的进步,废渣来料品位略有降低,原料水分普遍较高(≥20%),造成生产调配困难,金属回收率下降明显。该企业对原料增加了烘干预处理生产线,经处理后原料的含水量降低(≤2%),满足现有生产线对原料相关要求。 A reclaimed lead enterprise mainly recyles and uses the waste slag containing lead, such as lead soot and lead mud produced by the surrounding smelting enterprises. Due to the progress of upstream industry technology, the grade of waste slag incoming material is slightly reduced, and the moisture of raw material is generally higher(≥20%), resulting in production and allocation difficulties, and the metal recovery rate decreases significantly. The company added a drying and pretreatment production line for raw materials, and the water content of raw materials after treatment was reduced(≤2%), meeting the relevant requirements of existing production lines for raw materials.
作者 杜蓉 冯强 黄天龙 DU Rong;FENG Qiang;HUANG Tian-long(Northwest Research Institute of Mining and Metallurgy,Baiyin 730900,China)
机构地区 西北矿冶研究院
出处 《甘肃冶金》 2022年第4期60-62,共3页 Gansu Metallurgy
关键词 铅再生 含铅废渣 金属回收率 烘干预处理 lead regeneration waste slag containing lead metal recovery rate drying pretreatment
  • 相关文献

参考文献3

二级参考文献22

  • 1何艺,郑洋,何叶,郭晓玲,董悦,邹倚天,林虹,曹国庆.中国废铅蓄电池产生及利用处置现状分析[J].电池工业,2020(4):216-224. 被引量:16
  • 2陈维平,龚建森,黎七中.Fe ̄(2+)还原废蓄电池泥渣中PbO_2的试验研究[J].湖南大学学报(自然科学版),1995,22(6):53-58. 被引量:10
  • 3陈维平.一种湿法回收废铅蓄电池填料的新技术[J].湖南大学学报(自然科学版),1996,23(6):111-116. 被引量:32
  • 4郭翠香,赵由才.我国含铅废物现状及铅回收技术研究进展[J].有色冶金设计与研究,2007,28(2):46-49. 被引量:9
  • 5潘军青,孙艳芝,伊晓波.制备Na2[Pb(OH)4]溶液和从含铅废料中回收铅的方法[P].中国:102367577,2012-03-07.
  • 6Luiz. C. Ferracin, Abel E. et al. Lead recovery from a typical Brazilian sludge of exhausted lead - acid batteries using an electrohydromtallurgical process [ J ]. Hydrometallurgy, 2002 (65) : 137 - 144.
  • 7Morachevskii, A. G., Demidov, A. I., Vaisgant, Z. I., et al. Recovery of lead battery scrap using alkali - glycerol electrolyte [ J ]. Russ. J. Appl. Chem., 1996(69):412-414.
  • 8Farahmand, F., Moradkhani, D., Safarzadeh, M. S., et al. Brine leaching of lead - bearing zinc plant residues: Process optimization using orthogonal array design methodology [ J]. Hydrometallurgy,2009 (95) :316 -324.
  • 9Farahmand, F. , Moradkhani, D. , Safarzadeh, M. S. , et al. Optimization and kinetics of the cementation of lead with aluminum powder [ J ] Hydrometallurgy ,2009 ( 9g ) : 81 - 85.
  • 10Raghavan, R. , Mohanan, P.K. , Swarnkar, S.R. Hydrometallurgical processing of lead - bearing materials for the recovery of lead and silver as lead concentrate and lead metal [ J ] Hydrometallurgy, 2002 ( 58 ) : 103 - 116.

共引文献8

同被引文献2

引证文献1

二级引证文献1

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部