期刊文献+

制造业生产车间插单行为的研究 被引量:1

Research on Order Inserting Behavior of Manuf actur ing Workshop
下载PDF
导出
摘要 “插单”是制造型企业在生产过程中经常会出现的现象,是多重因素博弈的结果。“插单”不仅会打乱原有生产计划,容易造成生产现场混乱,部分订单逾期,甚至会打乱整体计划,增加生产成本,降低客户满意度,影响企业信誉。根据制造业供应链计划及管理经验,以A公司为例,研究生产过程中经常出现的“插单”现象,分析“插单”的成因及对生产经营的影响,提出相应的改善措施与对策。 Order insertion is a common phenomenon in the production process of manufacturing enterprises,which is the result of multi factors game.Inserting orders will not only disrupt the rhythm of the original production plan,leading to confusion in the production site,but also easily cause the delay of some orders,even disrupt the overall plan,increase production costs,reduce customer satisfaction,and affect the reputation of the enterprise.Based on experience of manufacturing supply cha in planning and management,taking company A as an example,makes an in-depth study on the phenomenon of order inserting that often occurs in the production process,analyzes the causes and its influence on production and operation,and puts forward corresponding improvement measures and countermea-sures.
作者 董鹏 陈丙艳 DONG Peng;CHEN Bingyan(Consulting Department of Shaanxi Zhi tong Management Consulting Co.,Ltd.,Xi'an 710000,Shaanxi,China;Product ion Department,Bolu Plastics Shanghai Co.,Ltd.,Shanghai 201413,China)
出处 《上海建材》 2022年第4期6-14,共9页 Shanghai Building Materials
关键词 制造业 插单 生产计划 生产车间 供应链 manufactur ing insert order production plan production workshop:supply chain
  • 相关文献

参考文献4

二级参考文献21

  • 1唐国兰,唐成华,吴云忠.车间生产计划动态调整应用研究[J].机电工程技术,2004,33(8):92-94. 被引量:3
  • 23assady C R, Kutanoglu E. Minimizing job tardiness using ntegrated preventive maintenance planning and production cheduling[J]. IIE Transactions, 2003,35 (6) 503-513.
  • 3Hadidi L A, A1-Turki U M, Rahim A. Integrated models in production planning and scheduling,maintenance and quality., a review[J] International Journal of Industrial and Systems Engineering, 2012,10 (1) :21-50.
  • 4Schmidt G. Scheduling with limited machine availability[J]. European Journal of Operational Research, 2000,121 (1) : 1-15.
  • 5Ma Y, Chu C, Zuo C. A survey of scheduling with deterministic machine availability constraints [J]. Computers Industrial Engineering, 2010,58(2) : 199-211.
  • 6Mosheiov G, Sarig A. Scheduling identical jobs and due-window on uniform machines [J]. European Journal of Operational Research, 2010,201(3) : 712-719.
  • 7SortrakulN,NachtmannHL,Cassady C R. Genetic algorithms for integrated preventive maintenance planning and production scheduling for a single machine[J]. Computers in Industry, 2005,56(2)161-168.
  • 8Wang S J, Liu M. A branch and bound algorithm for single- machine production scheduling integrated with preventive maintenance planning[J]. International Journal of Production Research, 2013,51 (3) : 847-868.
  • 9Berrichi A, Yalaoui F, Amodeo L, et al. Bi-Objective Ant Colony Optimization approach to optimize production and maintenance scheduling [ J ]. Computers Operations Research, 2010,37 (9) : 1584-1596.
  • 10Ruiz R,Garcia-Diaz J C, Maroto C. Considering scheduling and preventive maintenance in the flowshop sequencing problem [J] Computers Operations Research, 2007, 34 ( 11 ): 3314-3330.

共引文献24

同被引文献16

引证文献1

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部