以±800 kV特高压某换流站站用电系统为例,详细介绍其系统组成、10 kV以及400 V备自投系统逻辑,并结合10 kV和400 V备自投逻辑,分析其存在的问题,提出科学合理的改进建议,提升站用电及直流输电的可靠性。
The station power supply system of±800 kV ultra-high voltage Shaoshan converter station is taken as an example in this paper.The composition of the whole station power supply system and the automatic switching logic of 10 kV and 400V power supply are introduced.In view of the problems existing in the automatic switching logic of 10 kV and 400 V power supply,scientific and reasonable suggestions are introduced to improve the reliability of the DC transmission system.
作者
王应坤
刘顺意
黄晨
李倩如
杨江涛
WANG Yingkun;LIU Shunyi;HUANG Chen;LI Qianru;YANG Jiangtao(State Grid Hunan Electric Power Company Limited Extra High Voltage Substation Company,Changsha 410004,China;Substation Intelligent Operation and Inspection Laboratory of State Grid Hunan Electric Power Company Limited,Changsha 410004,China)
出处
《湖南电力》
2022年第4期90-94,共5页
Hunan Electric Power
关键词
换流站
站用电
备自投
可靠性提升
converter station
station power supply system
stand-by surrender