再谈满井放矿 被引量:1

Rediscussion on the Pass Drawing of Mine Shaft Filled with Ore
下载PDF
导出
摘要 溜井放矿有很多优点,但也存在一些大的隐患,影响它的应用。井筒装满矿降低井壁剪应力,消除冲撞和滚撞对井壁的磨损破坏。井筒装满矿产生的摩擦磨损,消除卸矿的矿石对井筒中矿石的冲撞,井筒中矿石的黏结力基本保持稳定,减少井筒结拱堵塞的概率。满井放矿是消除隐患的重要措施。 There are many advantages in pass drawing,but there are also some hidden dangers which affect its application.When the shaft is filled with ore,the shear stress of the shaft wall can be reduced,and the wear damage caused by collision and rolling on the shaft wall can be eliminated.The friction and wear caused by the shaft filling with ore can eliminate the impact of the unloading ore on the ore in shaft,and the cohesion of the ore in shaft is basically stable,reducing the probability of blockage due to arch forming in the shaft.Pass drawing when the mine shaft is full is an important measure to eliminate hidden danger.
作者 詹森昌 ZHAN Senchang
出处 《中国矿山工程》 2022年第4期21-24,共4页 China Mine Engineering
关键词 满井放矿 井壁应力 磨损破坏 堵塞跑矿 风险可控 pass drawing when the mine shaft is full wall stress wear damage block ore dropping risk controllable
  • 相关文献

参考文献8

二级参考文献22

  • 1胡黄龙.溜矿井堵塞与贮矿高度的关系[J].有色冶金设计与研究,1999,20(1):6-9. 被引量:10
  • 2吴建华.露天矿主溜井降段方法及防止堵塞跑矿的对策[J].冶金矿山设计与建设,1995,27(5):35-39. 被引量:3
  • 3Silverstein MD, Heit JA, Mohr DN, et al. Trends in the incidence of deep vein thrombosis and pulmonary embolism: a 25-year population-based study. Arch Intern Med, 1998,158:585-593.
  • 4黄邦国.尖二号溜井的堵塞与处理[J].冶金矿山设计与建设,1997,29(2):38-42. 被引量:1
  • 5魏子昌,詹森昌,杨树本,等.对德兴铜矿1号溜井矿石移动规律及其磨损的考察[J].金属矿山,1984(8):7-10.
  • 6郭宝昆,张福珍.矿石在溜井各区内的移动特点及其分析[J].黄金,1985(3):20-25.
  • 7侯鹏翔.采矿设计手册(井巷工程卷)[M].北京:中国建筑工业出版社,1989.
  • 8张泽荫.溜井放矿技术进展[J].金属矿山,1987(6):31-33.
  • 9吕向东.高深溜井结构优化与应用技术研究[D].西安:西安建筑科技大学,2012.
  • 10郭宝昆,张福珍.矿石在溜井各区内的移动特点及其分析[J].黄金,1985(3):20-25.

共引文献57

同被引文献15

引证文献1

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部