2CHAU K W, ANSON M, ZHANG J P. 4D dynamic construction management and visualization software: 1. development [J]. Automation in Construction, 2005, 14 (4) :512-524.
3CHAU K W, ANSON M, SARAM D D D. 4D dynamic construction management and visualization software: 2. site trim [J]. Automation in Construction, 2005, 14 (4) :525-536.
4WANG H J, ZHANG J P, CHAU K W, et al. 4D dynamic management for construction planning and resource utilization [ J ]. Automation in Construction, 2004, 13 (5) :575-589.
5CHAU K W, ANSON M, ZHANG J P. Four-dimensional visualization of construction scheduling and site utilization [ J ]. Journal of Construction Engineering and Management, 2004, 130 (4) :598-606.
6ZHANG J P, HU Z Z. B1M-and 4D-based integrated solution of analysis and management for conflicts and structural safety problems during construction: 1. principles and methodologies [ J ]. Automation in Construction, 2011,20 (2) : 155-166.
7POPOV V, JUOCEICIUS V, MIGILINSKAS D, et al. The use of a virtual building design and construction model for de- veloping an effective project concept in 5D environment [ J]. Automation in Construction, 2010, 19 (3) :357-367.
8KYMMELL W. Building information modeling: planning and managing construction projects with 4D CAD and simulations [ M ]. New York : McGraw-Hill, 2008.
9LI H, CHAN N, HUANG T, et al. Optimizing construction planning schedules by virtual prototyping enabled resource a- nalysis [ J]. Automation in Construction, 2009, 18 (7) :912-918.
10GOEDERT J D, MEADATI P. Integrating construction process documentation into building information modeling [ J ]. Journal of Construction Engineering and Management, 2008, 134 (7) :509-516.