某超大深基坑工程存在多层混凝土支撑结构,且邻近地铁盾构隧道,通过对支撑拆除工艺的优化完善,顺利完成了复杂工况下的多层混凝土支撑结构拆除工作,并确保了超深基坑结构稳定以及地铁盾构隧道安全,为同类工程提供借鉴经验。
A super deep foundation pit project has a multi-layer concrete support structure and is adjacent to the metro shield tunnel.Through the optimization and improvement of the support removal process,the removal of the multi-layer concrete support structure under complex conditions has been successfully completed,and the stability of the super deep foundation pit structure and the safety of the metro shield tunnel have been ensured,provid which reference for similar projects.
作者
张永富
郭鹏飞
张雅婧
王吉
Zhang Yong-Fu;Guo Peng-fei;Zhang Ya-jing;Wang Ji
出处
《建筑技术开发》
2022年第16期52-54,共3页
Building Technology Development
基金
中建二局第三建筑工程有限公司课题(CSCEC2b3-2020-K-33)。
关键词
超大深基坑
多层混凝土支撑结构
地铁盾构隧道
支撑拆除
super large deep foundation pit
multi–layer concrete support structure
metro shield tunnel
support removal