摘要 针对深中通道岛隧工程受隧道东端堰筑段施工未预留沉管隧道贯通测量通道影响的情况,通过网形优化设计和理论分析研究,在堰筑段顶板施工封闭前,分阶段采用了“光学投点+GNSS静态”向堰筑段内投射贯通测量基准点并延伸到沉管隧道对接端的方法。经现场实测与精度评估,得出了各阶段点位精度的主要影响因素及对整个隧道贯通带来的误差大小,对隧道施工具有重要指导作用。 In view of the fact that the Shenzhen-Zhongshan Link island and tunnel project is affected by the construction of the weir section at the eastern end of the tunnel without setting the penetration survey passage of the immersed tube tunnel,through the optimization design of the network shape and the theoretical analysis, before the roof construction of the weir section is closed, the method of "optical drop point + GNSS static" is adopted in stages to project the measuring control point in the weir construction section and extend to the butt end of the immersed tunnel. Through field measurement and accuracy evaluation, the main influencing factors of point location precision in each stage and the error of the whole tunnel penetration are obtained, which has important guiding function for tunnel construction.
作者 成益品 张浩强 张超 董理科 韩战伟 CHENG Yi-pin;ZHANG Hao-qiang;ZHANG Chao;DONG Li-ke;HAN Zhan-wei(No.2 Engineering Co.,Ltd.Of CCCC First Harbor Engineering Co.,Ltd.,Qingdao,Shandong 266071,China;China Communications Construction Co.,Ltd.,Beijing 100088,China)
出处 《中国港湾建设》 2022年第8期55-59,共5页 China Harbour Engineering
基金 广东省重点领域研发计划项目(2019B111105002)。
关键词 沉管隧道 贯通测量 光学投点+GNSS静态 导线测量 immersed tunnel penetration survey optical drop point+GNSS static traverse survey
  • 相关文献

参考文献3

二级参考文献16

共引文献18

同被引文献14

引证文献3

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部