预制钢沉井的施工关键技术 被引量:1

Key Construction Technology of Prefabricated Steel Caisson
下载PDF
导出
摘要 结合城市核心区市政工程管线改迁、新建等施工面临的作业场地受限、施工作业面较小的难题,以及施工对环境的影响需尽可能小等要求,综合考虑工程位置、场地布置、地质环境等条件,系统研究了预制钢沉井在工厂内分块分段制作、现场焊接拼装下沉等一系列的关键施工控制技术,并建立了沉井施工过程自动化监测体系,有效确保了施工过程中结构本体与周边环境安全,为后续类似工程的施工提供了参考经验。 In view of the difficulties faced by the relocation and new construction of municipal engineering pipelines in the core area of the city, such as the limited operation site, the small construction operation surface, and the requirement that the impact of construction on the environment should be as small as possible, and taking into account the project location, site layout, geological environment and other conditions, a series of key construction control technologies, such as the block and section production of prefabricated steel caisson in the factory, on-site welding, assembly and sinking,are systematically studied. An automatic monitoring system is established for the construction process of open caisson,which effectively ensures the safety of the structure and the surrounding environment during the construction process. It provides reference experience for the subsequent construction of similar projects.
作者 陆大伟 LU Dawei(Shanghai Construction Group General Contracting Department,Shanghai 200080,China)
出处 《建筑施工》 2022年第8期1900-1903,共4页 Building Construction
关键词 钢沉井 工厂分块预制 现场焊接拼装 自动监测 steel caisson factory block prefabrication field welding and assembly automatic monitoring
  • 相关文献

参考文献5

二级参考文献15

共引文献18

同被引文献3

引证文献1

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部