摘要 转体施工法作为一种桥梁施工方法,由于其特有的施工优越性,使得其被广泛应用于斜拉桥索塔的施工之中。然而,由于斜拉桥索塔施工工序繁多和施工工艺复杂,加之需保证转体过程顺滑、稳定及精度要求。故为了降低施工期间风险,对斜拉桥索塔转体施工期进行结构安全风险评估是十分有必要的。依托某斜拉桥索塔转体施工为背景,基于ALARP准则桥梁风险矩阵方法,识别施工期间风险源,进行风险分析,为充分了解施工风险,制定相应的防范措施来控制和降低风险水平,以确保斜拉桥施工期安全。 As a bridge construction method,the rotation construction method is widely used in the construction of cable-stayed bridge pylon due to its unique construction advantages.However,owing to the various construction procedures and complex construction technology of cable-stayed bridge pylon,in addition,it is required to ensure that the rotation process is smooth,stable and accurate.Therefore,in order to reduce the risk during the construction period,it is very necessary to carry out the structural safety risk assessment during the rotation construction of cable-stayed bridge pylon.Relying on the background of a cable-stayed bridge pylon rotation construction,according to the bridge risk matrix method of ALARP criteria,the risk source during construction is identified,and the risk analysis is carried out.In order to fully comprehend the construction risk,the corresponding preventive measures are formulated to control and reduce the risk level so as to ensure the safety of cable-stayed bridge construction period.
作者 苑晓锋 夏宇轩 沈毅凯 YUAN Xiaofeng;XIA Yuxuan;SHEN Yikai
出处 《城市道桥与防洪》 2022年第9期143-145,153,M0014,共5页 Urban Roads Bridges & Flood Control
基金 上海建科集团科研创新项目(KY10000038.20200033)。
关键词 斜拉桥 转体施工 风险评估 风险矩阵 cable-stayed bridge rotation construction risk assessment risk matrix
  • 相关文献

同被引文献6

引证文献1

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部