摘要
为保证某钢厂出钢量,满足用户扩容要求,以140 t转炉为例,提供了一种对其进行产能扩容改造的方法,并重点对改造时所需要注意的技术要点与现场作业内容进行系统阐述。通过改造实践,取得了显著效果。
In order to ensure the tapping capacity of a steel plant and meet the capacity expansion requirements of users,a method for capacity expansion and transformation of 140 t converter is provided,and the technical points and on-site operation contents that need to be paid attention to during the transformation are systematically expounded.Through the reform practice,remarkable results have been achieved.
作者
张皓天
Zhang Haotian(Technology Center of Taiyuan Heavy Industry Co.,Ltd.,Taiyuan Shanxi 030024)
出处
《山西冶金》
CAS
2022年第5期188-189,193,共3页
Shanxi Metallurgy
关键词
转炉
倾动
炉壳
托圈
悬挂系统
齿轮
converter
tilting
furnace shell
support ring
suspension system
gear