摘要
文章从弹性吊索结构、弹性吊索张力、弹性吊索一次到位施工工艺要点、质量保证措施、安全保证措施、环境保护措施6个方面着手进行分析,以汉十高铁为例进行研究,为客运专线、高速铁路弹性吊索的安装提供参考。
The article analyzes from six aspects:elastic sling structure,elastic sling tension,elastic sling in one place construction process points,quality assurance measures,safety assurance measures,and environmental protection measures.Provide reference for the installation of elastic slings on passenger dedicated lines and high-speed railways.
作者
潘兆舟
PAN Zhaozhou(China Railway 11th Bureau Group Electrical Engineering Co.,Ltd.,Wuhan 430074,China)
关键词
高速铁路
接触网
弹性吊索
一次到位安装
high-speed railway
catenary
elastic sling
installation in one place