W3305进风顺槽过陷落柱段巷道围岩控制技术研究 被引量:2

Research on Surrounding Rock Control Technology of W3305 Inlet Passing Collapse Column Roadway
下载PDF
导出
摘要 针对山西某矿W3305进风顺槽掘进过程中存在一长轴35 m,短轴26 m的陷落柱,为降低陷落柱造成的围岩变形大及易冒顶的问题,结合其具体的工程地质条件,采用“超前预注浆+支护锚杆(锚索)+工字钢棚”联合支护技术进行巷道围岩的控制,现场监测结果表明:采用该支护形式后,巷道两帮围岩的最大变形量减少了13.43 mm,顶板最大下降量减少了11.31 mm,提出的过陷落柱段巷道联合支护技术取得了良好的支护效果。 In view of the existence of a collapse column with a long axis of 35 m and a short axis of 26 m during the tunneling process of W3305 intake roadway in a mine in Shanxi,in order to reduce the problem of large deformation of surrounding rock and easy roof fall caused by the collapse column,combined with its specific engineering geological conditions,the combined support technology of"advance pre-grouting+support bolt(anchor cable)+I-steel shed"is adopted to control the surrounding rock of roadway.The field monitoring results show that:after adopting this support form,the maximum deformation of the surrounding rock of the two sides of the roadway is reduced by 13.43 mm,and the maximum decline of the roof is reduced by 11.31 mm.The proposed combined support technology of roadway passing through the collapse column section has achieved good support effect.
作者 冯纬 Feng Wei(Audit Sharing Center of Lu'an Chemical Group,Changzhi Shanxi 046204)
出处 《同煤科技》 2022年第3期18-20,共3页 Datong Coal Science & Technology
关键词 陷落柱 变形破坏 联合支护 现场监测 Collapse column Deformation and failure Combined support Field monitoring
  • 相关文献

参考文献7

二级参考文献34

共引文献85

同被引文献7

引证文献2

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部