文中以富春湾大道(一期)工程EPC项目为依托,针对隧道与管廊基坑相邻建设的情况,采用了管廊与隧道共一道围护墙、管廊与隧道基坑分期实施的技术,实现了优化结构设计、降低工程造价的目标,可为工程项目提供借鉴和参考。
Based on the EPC project of Fuchun Bay Avenue(Phase I) project, the divided pit and staged construction technology of pipe gallery and tunnel with shared enclosure system was proposed, according to the construction of the tunnel and the pipe gallery adjacent to each other. This technology adopted the shared enclosure system, divided pit and staged construction, which achieves the goal of optimizing the structural design and reducing the project cost. This technology can provide reference and reference for the engineering project.
作者
刘伟
陈江
Liu Wei;Chen Jiang(Zhejiang Jiaogong Underground Engineering Co.Ltd.,Hangzhou,Zhejiang 311421)
出处
《江西建材》
2022年第7期223-226,共4页
Jiangxi Building Materials
关键词
共用围护
分坑分期施工
管廊
隧道
Shared enclosure system
Divided pit and staged construction
Pipe gallery