摘要
文中以郑州轨道交通8号线的一期工程为例,探讨了盾构隧道较近距离下穿既有加油站相关施工作业关键技术及其控制,以供参考。
Taking the first phase of Zhengzhou Rail transit Line 8 project as an example, this paper discusses the key construction techniques and control of shield tunnel passing through the existing petrochemical gas station in a short distance, for reference.
作者
王恒旭
朱旭
Wang Hengxu;Zhu Xu(China 1lth Engineering Bureau of Water Resources and Hydropower Co.Ltd.,Zhengzhou,Henan 450001)
出处
《江西建材》
2022年第7期281-282,共2页
Jiangxi Building Materials
关键词
既有石化加油站
盾构隧道
近距离穿越
Existing petrochemical gas stations
Shield tunnel
Mindlin elastic method