摘要
传统工程项目信息管理优化方法的信息管理时间较长,管理优化效果随之下降。设计基于小波变换的工程项目信息管理优化方法,分析工程项目信息特点,整体把控项目信息的动态变化;优化工程项目信息管理模式,缩短项目工程信息管理时间。基于小波变换构建信息管理模型,进一步提高项目工程的信息管理水平,由此实现工程项目信息的优化管理。采用对比实验的方式,验证新的信息管理优化方法管理时间更短,极具推广价值。
The information management time of traditional engineering project information management optimization method is long,and the effect of management optimization decreases.The optimization method of engineering project information management based on wavelet transform is designed to analyze the characteristics of project information and control the dynamic changes of project information as a whole;optimize the project information management mode and shorten the project information management time.The information management model is constructed based on wavelet transform to further improve the information management level of project,so as to realize the optimal management of project information.By means of comparative experiment,it is verified that the new information management optimization method has shorter management time and great promotion value.
作者
陈春丽
CHEN Chunli(School of Architecture and Ceramic Design,Xuchang Ceramics Vocational College,Xuchang Henan461000,China)
出处
《北方建筑》
2022年第4期7-10,共4页
Northern Architecture
关键词
小波变换
工程
项目信息
管理
优化方法
wavelet transform
engineering
project information
administration
optimization method