德龙2号高炉填充式停炉实践

Blow off Operation in Delong Steel No.2 BF with Coke Filled
下载PDF
导出
摘要 对德龙2号高炉填充式停炉实践进行了总结。通过制订详细的停炉方案,在停炉过程中进行精细化管理和操作,炉顶温度控制在300℃以下,风量控制在1900m^(3)/min上限,实现了快速降料面,荒煤气全部回收利用,停炉用时8h44min。开发了扒炉新工具,加快了扒炉速度,降低了炉前工作强度,用时22h将料面扒至风口中心线。 The coke flling type blow ff operation practiced in Delong Steel No.2 BF is summarized.By working out a detailed blow ffscheme,executing delicacy management and operation,keeping the furnace top temperature below 300℃,and controling the blast flow rate below 1900 m^(3)/min during blow offoperation,the stockline of the furnace is lowered down rapidly and the crude gas gets fully recovered,The blow ff operation lasts 8 h and 4 min.The novel raking tool developed speeds up the raking operation,relieves the cast house operator from heavy labor intensity,and enables the stockline being lowered down to the tuyere centerline level only in 22 hours.
作者 任可飘 王瑞强 刘燕军 佘雪峰 刘欢 REN Kepiao;WANG Ruiqiang;LIU Yanjun;SHE Xuefeng;LIU Huan(University of Science and Technology Beijing;Delong Iron and Steel Co.,Ltd.;Hebei Hot-rolled Plate and Strip Technology Innovation Center)
出处 《炼铁》 CAS 北大核心 2022年第4期40-44,共5页 Ironmaking
基金 中央高校基本科研业务费专项资金资助项目(FRF-TT-20-05)。
关键词 高炉 填充式停炉 扒炉 顶温控制 煤气全回收 blast furnace furnace blow off with coke flled stock raking top temperature control full gas recovery
  • 相关文献

参考文献6

二级参考文献13

共引文献25

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部