摘要 通过分析大黑汀水利枢纽渠首电站运行中存在的问题,提出了机组转轮渗漏油、拦污栅抓梁、机组增效扩容等改造措施,工程防洪能力、发电效率、供水效益等得到了充分的提高,取得了较好效果。 By analyzing the problems existing in the operation of the hydropower station at canal head of the Daheiting Water Control Project,the rehabilitation measures such as treatment of oil leakage from the runner of the unit,restoration of grabbing beams for the trash rack,and expansion of the unit capacity are put forward.The project flood control capacity,power generation efficiency,and water supply benefits have been significantly improved,and the transformation has been successful.
作者 齐津安 周涛 李秀峰 周世虎 付靓 QI Jin'an;ZHOU Tao;LI Xiufeng;ZHOU Shihu;FU Liang(Luanhe River Diversion Project Administration under Haihe River Water Conservancy Commission,MWR,Qianxi 064300,China)
出处 《西北水电》 2022年第4期90-93,共4页 Northwest Hydropower
关键词 转轮渗漏油 拦污栅抓梁 机组改造 效益分析 oil leakage from runner grab beam of trash rack unit rehabilitation benefit analysis
  • 相关文献

参考文献1

二级参考文献5

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部