摘要 为研究V墩施工和成桥下的受力,合理确定V墩结构尺寸,基于平潭竹屿湖大桥,在满足各项设计条件及技术指标下,针对几种不利工况,分别研究V墩墩高、叉角角度、墩身厚度等设计参数对结构受力的影响,最终确定了V墩结构的合适尺寸,同时也发现了V墩在施工过程不对称荷载作用下,其受力情况可能比成桥状态更为不利,应针对不同工况加强结构,本文也可为同类结构设计提供参考。 To study the structural internal force of V-shaped pier during the construction and completion state, and determine the structure of V-shaped pier reasonably, the paper analyzed the influence of the pier height, the pier angle, the pier thickness, etc., on the structure of the Zhuyu Lake Bridge in Pingtan, based on several adverse conditions which meets the design conditions and the technical indicators. Finally, the suitable dimensions of V-shaped pier was determined. In addition, the internal situation during the asymmetrical loading construction of the V-shaped may be more adverse than the completion state. Thus, according to the different load condition, the structure should be strengthened. The study of this paper can also provide reference for similar structural design.
作者 郭潇艺 GUO Xiaoyi
出处 《福建建设科技》 2022年第5期107-109,127,共4页 Fujian Construction Science & Technology
关键词 V型墩 工况 结构设计参数 强度 裂缝 V-shaped pier Load condition Structural design parameters Strength Cracks
  • 相关文献

参考文献1

二级参考文献3

共引文献5

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部