综采工作面带式输送机快速安装工艺 被引量:2

Quick Installation Process for Belt Conveyors at Header Workings
下载PDF
导出
摘要 为了提高综采工作面带式输送机安装效率及安装质量、缩短输送机安装周期、保证带式输送机安装后安全稳定运行,机电科通过技术研究,对8119工作面DTL型带式输送机采取一套安全快速安装工艺。通过实际应用效果来看,与8108工作面带式输送机安装工艺相比,8119工作面带式输送机安装周期缩短了2.5 d,输送机安装后在后期运行过程中故障率降低了15%,有效保证了工作面安全、高效回采,取得了显著应用成效。 In order to improve the installation efficiency and quality of the belt conveyor at the comprehensive mining face,shorten the installation period of the conveyor and ensure the safe and stable operation of the belt conveyor after installation,the Mechanical and Electrical Section adopts a set of safe and rapid installation technology for the DTL-type belt conveyor at the 8119 working face through technical research.Compared with the installation process of belt conveyor at 8108 working face,the installation period of belt conveyor at 8119 working face is shortened by 2.5 d.The failure rate of the conveyor after installation is reduced by 15% in the later operation process,which effectively ensures the safe and efficient recovery of the working face and achieves significant application results.
作者 武瑞瑾 Wu Ruijin(Jinneng Holding Coal Group Baidong Mining Co.,Ltd.,Datong Shanxi 037031)
出处 《机械管理开发》 2022年第9期309-310,共2页 Mechanical Management and Development
关键词 综采工作面 带式输送机 快速安装 系统调试 comprehensive mining face belt conveyor quick installation system commissioning
  • 相关文献

参考文献5

二级参考文献19

共引文献14

同被引文献8

引证文献2

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部