摘要
结合我国电力电缆隧道和综合管廊实施现状,分析了预制箱涵的优势。对预制箱涵的成本进行分解,应用模糊层次分析法建立评价模型,找出影响预制箱涵成本的主要因素。实际工程应用表明预制箱涵比现浇箱涵具有经济优势。
The advantages of precast box culvert are analyzed combining with the present construction situation of power cable tunnel and utility tunnel in China.The main factors affecting the cost of precast box culvert are found out by breaking down the cost of precast box culvert and establishing the evaluation model using fuzzy analytic hierarchy process.The practical engineering application shows that the economical evaluation of precast box culvert is better than cast-in-place box culvert.
作者
刘学峰
肖祥
赵国磊
刘成涛
LIU Xuefeng;XIAO Xiang;ZHAO Guolei;LIU Chengtao(Shandong Electric Power Engineering Consulting Institute Co.,Ltd.,Jinan 250013,China;Jinan Heyuan Engineering Consulting Institute Co.,Ltd.,Jinan 250000,China;Shandong Hengji Power Engineering Supervision Co.,Ltd.,Liaocheng,China)
出处
《山东电力高等专科学校学报》
2022年第4期32-34,38,共4页
Journal of Shandong Electric Power College
关键词
预制箱涵
成本分解
模糊层次分析
评价模型
precast box culvert
cost breakdown
fuzzy analytic hierarchy process
evaluation model