3CHRYSSOLOURIS G,CHAN S.An Integrated Approach to Process Planning anti Scheduling[ J ] .Annals of the CIRP, 1985,34( 1 ) :413-417.
4BECKENDORFF U, KREUTZFELDT J, UL1.MANN W. Re- active Workshop Scheduling Based on Alternative Routings [ C ]. Proceedings of a Conference on Factory Automation and Information Management. Boca Raton, Florida: CRC Press Inc., 1991:875-885.
5KHOSHNEVIS B,CHEN Q M.lntegration of Process Plan- ning and Scheduling Function [ C ]. IIE Integrated Systems Conference & Society for Integrated Manufacturing Confer- ence Proceedings. Atlanta: Industrial Engineering & Man- agement Press, 1989 : 415-420.
6ZHANG H C.1PPM a Prototype to lntegraled Process Plan- ning and Job Shop Scheduling Functions [ J ].Annals of the CIRP, 1993,42( 1 ) :513-517.
7LARSEN N E. Methods for Integration of Process Planning and Production Planning[ J ] .International Journal of Com- puter Integrated Manufacturing, 1993,6(1/2) :152-162.
8QIAO Lihong.Establishing Geometry and Functional Param- eters Relationships through Regression Analysis and their Assistance to Product Customization [ J ]. International Jour- nal of Advanced Manufacturing Technology, 2012, 58 ( 5/ 8 ) : 727- 740.