摘要
地铁BAS系统是采用计算机地铁BAS系统网络、自动控制以及分布式智能等技术,实现地铁车站与空调通风、给排水、照明、电扶梯等相关专业的运行管理及控制的综合系统。通过最优化的组合确保机电设备处于安全、高效、节能和最佳的运行状态,从而提供一个舒适的乘车环境。文章以地铁车站施工调试为依托,从施工方的角度出发,着重探讨和分析了车站BAS系统调试过程中遇到的问题和处理方法,旨在给地铁工程管理者从调试技术管理方面带来启发,从而能够进一步提升调试效率。
Subway BAS system is a comprehensive system that adopts computer subway BAS system network,automatic control,distributed intelligence and other technologies to realize the operation management and control of subway stations and related disciplines such as air conditioning and ventilation,water supply and drainage,lighting,escalators and so on.The optimized combination ensures that the electromechanical equipment is in a safe,efficient,energy-saving and optimal operation state,so as to provide a comfortable riding environment.This paper focuses on the problems encountered in the commissioning of station BAS system and the treatment methods from the perspective of the construction party,in order to inspire the subway project managers from the commissioning technology management,so as to further improve the commissioning efficiency.
作者
刘鹏
LIU Peng(China Railway 16th Bureau Group Electrification Engineering Co.,Ltd.,Beijing 100018,China)
出处
《数字通信世界》
2022年第9期68-70,共3页
Digital Communication World
关键词
地铁
BAS系统
协同
调试
问题处理
subway
BAS system
coordination
commissioning
problem handling