预应力混凝土连续箱梁上跨通州萧太后河汛期施工技术研究 被引量:2

TECHNICAL RESEARCH ON CONSTRUCTION OF PRESTRESSED CONCRETE CONTINUOUS BOX GIRDER OVER TONGZHOU XIAOTAIHOU RIVER IN FLOOD SEASON
下载PDF
导出
摘要 在河道内汛期施工连续梁,既要确保梁体支架安全稳定度汛,又要满足汛期内河道泄洪需要,同时保证工期。从北京通州文化旅游区5号桥上跨萧太后河分洪渠实例入手,对汛期连续梁施工进行总结研究,可为同类桥梁汛期施工提供参考,同时为下一步深入研究打下基础,具有一定的推广价值。 Construction of continuous girder in watercourse during flood season shall not only ensure the safe&reliable performance of girder support in flood season,but also meet the requirements of watercourse for flood discharge and guarantee the construction period.Conduct summative research on the construction of continuous girder in flood season,based on the flood diversion channel of 5#Bridge over Xiaotaihou River in Tongzhou Cultural Tourism Zone Beijing,provide reference to construction of similar bridges in flood season and meanwhile lay foundation for subsequent in-depth research,with a certain promotional value.
作者 王传任 WANG Chuan-ren(BCEG Civil Engineering Co.,Ltd.,100015,Beijing,China)
出处 《建筑技术》 2022年第9期1195-1198,共4页 Architecture Technology
关键词 高架连续梁 跨河道 汛期施工 elevated continuous girder across river construction in flood season
  • 相关文献

参考文献4

二级参考文献11

共引文献4

同被引文献7

引证文献2

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部