摘要
国道109新线高速公路第十工区预制梁场施工中,减少林业用地,保护生态环境,减少工作量,减少外界干扰,克服预制梁场在曲线、弯道和较大纵坡局限性影响,在经济上节约征地费用,加快了施工进度。
During construction of precast beam yard in Section 10 New Expressway of National Road 109#,reduce forestry land,protect ecological environment,lower down workload,decrease external disturbance,overcome the restrictions of precast beam yard in curve,bend and large longitudinal slope,reduce the land acquisition costs,and speed up construction.
作者
王亮
王传任
WANG Liang;WANG Chuan-ren(BCEG Civil Engineering Co.,Ltd.,100015,Beijing,China)
出处
《建筑技术》
2022年第9期1207-1210,共4页
Architecture Technology
关键词
预制梁场
曲线弯道
较大纵坡
进度经济
precast beam yard
curve&bend
large longitudinal slope
progress economy