期刊文献+

破顶断面对围岩稳定性的影响数值模拟研究

Numerical simulation of the influence of the top breaking section on surrounding rock stability
下载PDF
导出
摘要 以桃园煤矿Ⅱ1044机巷地质条件为背景,运用FLAC^(3D)数值模拟方法,对比分析巷道采用破“L”型内嵌式顶板断面与原梯形断面在开挖后不支护情况下围岩稳定性的差异。研究表明:与梯形断面相比,破顶断面垂直应力峰值减小;塑性区的差异主要在顶板上方;与梯形断面相比,破顶断面高帮位移量减少,但顶板位移量显著增大。 With the geological conditions of Taoyuan Coal MineⅡ1044 machine lane as the background,the FLAC^(3D) numerical simulation method is used to compare and analyze the difference between the stability of the surrounding rock using the broken"L"type embedded roof section and the original trapezoidal section without the support after excavation.The study shows that the vertical stress peak of the top breaking section decreases;the difference in the plastic area is mainly above the top plate,and the high gang displacement of the top breaking section decreases,but the top plate displacement is significantly increased.
作者 方勇 娄培杰 张必昇 FANG Yong;LOU Peijie;ZHANG Bisheng(School of Civil Engineering and Architecture,Anhui Universityof Science and Technology,Huainan 232001,China)
出处 《四川建材》 2022年第9期68-69,72,共3页 Sichuan Building Materials
关键词 不支护 围岩稳定性 FLAC^(3D) 数值模拟 no support surrounding rock stability FLAC^(3D) numerical simulation
  • 相关文献

参考文献6

二级参考文献58

共引文献31

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部