桃源水电站尾水位降低对机组安全性的影响评估

Impact Evaluation of the Lowering of Tail Water Level on the Safety of Generating Units in Taoyuan Hydropower Station
下载PDF
导出
摘要 近年来,桃源水电站受两次河道整治影响,尾水位降低,导致最大水头变大,超出了机组设计的运行范围,影响机组的安全运行。基于桃源水电站实际运行水位数据,分析了电站尾水位降低情况,获取了实际运行可能出现的最大水头;对该水头下水轮机主要部件的强度进行了复核,分析了最大水头变化后机组运行情况,复核了空化性能。从评估结果来看,最大水头提高后,部分部件强度超出标准值,空化情况将加重,机组运行安全性方面存在风险。 In recent years,the tail water level of Taoyuan Hydropower Station decreases as two river improvements,which results in the increase of maximum operation head of generating units.The increased maximum head exceeds the designed operating range of the units and may affect the safe operation of units.Based on the actual operating water level data of Taoyuan Hydropower Station,the reduction of the tail water level is analyzed,and the possible maximum water head that may occur in actual operation is obtained.The stresses of the main components of turbine under possible maximum head are reviewed,the operation safety of unit is analyzed and the cavitation performance is also reviewed.Based on the evaluation results,after the maximum water head is increased,the stresses of some components exceed the standard limits,the cavitation situation will be aggravated,and there is a risk in the operation safety of units.
作者 刘波 郭定宇 刘霞 黄梅 LIU Bo;GUO Dingyu;LIU Xia;HUANG Mei(Sinohydro Taoyuan Development Co.,Ltd.,Changde 415799,Hunan,China;PowerChina Zhongnan Engineering Corporation Limited,Changsha 410014,Hunan,China)
出处 《水力发电》 CAS 2022年第10期72-76,87,共6页 Water Power
关键词 尾水位降低 贯流式机组 最大水头 部件强度 空化 机组安全性 评估 桃源水电站 tailwater level lowering tubular turbine maximum head component strength cavitation unit safety evaluation Taoyuan Hydropower Station
  • 相关文献

参考文献9

二级参考文献27

共引文献31

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部