区域开发规划建设统筹模式研究——以临港新片区滴水湖核心片区为例 被引量:4

Research on the Overall Planning Mode of Planning and Construction of Regional Development:Takes Dishuihu Core Area of Lin-gang Special Area as an Example
下载PDF
导出
摘要 统筹政府、平台公司、开发主体等相关主体行为,保障项目有效运行,对于区域开发项目而言至关重要。本文围绕战略目标的落地,提出“1+X+N”创新管理模式下的规划建设统筹总体框架,并从主体职责、协同工作机制、统筹工作内容、保障措施等方面分析规划建设统筹工作机制,以滴水湖核心片区建设为例进行探讨,希望以此明确统筹规划建设的关键环节和有效模式,打通政府、市场“横向”与“纵向”间的协同,探索一种高水平规划、高标准设计、高品质建设、多主体参与、全生命周期管控的统筹模式,形成“一套机制”保障片区开发项目成功实施。 Coordinate the behaviors of the government,platform companies,development entities and other relevant entities to ensure the effective operation of the project,is important to the success of regional development.This paper focuses on the implementation of strategic goals,establishes overall planning framework of planning and construction of regional development under the innovative management model of “1+X+N”,and analyzes the overall working mechanism from the perspective of main responsibilities,cooperative working mechanism,overall work content and safeguard measures.Takes Dishuihu core area of Lin-gang special area as an example,hopes to clarify the key links and effective modes of overall planning mode,opens up the collaboration between the “horizontal” and “vertical” of the government and the market,explores a comprehensive mode of high-level planning,high-standard design,high-quality construction,multi-agent participation,and full life cycle control,and form a “set of mechanisms” to ensure the successful implementation of regional development projects.
作者 张振生 ZHANG Zhensheng(Shanghai Jianke Engineering Consulting Co.,Ltd,Shanghai 200032,China)
出处 《建筑经济》 北大核心 2022年第10期5-11,共7页 Construction Economy
关键词 规划建设统筹 区域开发 政府项目管理 体制机制 overall planning and construction regional development government project management institutional mechanisms
  • 相关文献

二级参考文献24

  • 1胡军.开发区政府行为的制度分析:对泰达管理体制的研究[J].上海经济研究,2005,17(11):94-97. 被引量:4
  • 2周文天.滨海新区升格获准成立一级政府,将获更大自主权[EB/OL].http://www.bh.gov.cn/bhxw/system/2009/11/10/010036555.shtml,2009-11-10.
  • 3崔东.天津滨海新区将于2020年全面实现目标定位[EB/OL].http://polities.people.con.cn/GB/10659176.html,2009-12-27.
  • 4Thomas Reichmann. Controlling Concept of Management Control, Controllership, and Rations, Springer, 1997
  • 5ISO TR 14177 Classification of information in the construction industry, 1994
  • 6Lee S. Kang, Boyd C. Paulson. Adaptability of information classification systems for civil works, Journal of construction engineering and management, December 1997
  • 7Lee S. Kang, Boyd C. Paulson. Information management to integrate cost and schedule for civil engineering projects. Journal of construction engineering and management, September/October 1998
  • 8PMI, A Guide To The Project Management Body Of Knowledge, (PMBOK Guide) 2000 Edide Newtown Square, Pennsylvania USA, 2001
  • 9Thomas Froese. Models of construction process information.Journal of computing in civil engineering, July 1996
  • 10Thoms Froese. C hallenge and a vision for computer-integrated management systems for medium-sized contractors, http: //www. civil. ubc. ca/home/tfroese/public-huml/pubs /fro97bchallenges/fro97b. html, 2002. 5

共引文献66

同被引文献25

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部