摘要
阐述M701F4燃气-蒸汽联合循环机组FCB的性能试验,操作步骤,风险防范措施,探讨试验过程中出现的问题与解决方法,包括同期并网、孤岛运行状态、工况负荷变化。
This paper expounds the performance test, operation steps and risk prevention measures of the FCB of M701F4 gas steam combined cycle unit, and discusses the problems and solutions in the test process, including the synchronization of grid connection, island operation status, and load changes under working conditions.
作者
杨立斌
YANG Libin(Guangdong Yuedian Zhongshan Thermal Power Plant Co.,Ltd.,Guangdong 528400,China.)
出处
《集成电路应用》
2022年第7期194-195,共2页
Application of IC