摘要
大型抽水蓄能机组具有转速快、制造精度高、运行情况复杂的特点,磁极采用完全向心的塔形结构可消除侧边拉力,其制造与装配的高标准给传统工艺带来前所未有的挑战。本文通过对某大型磁极的问题处理及过程控制,提出有效工艺方案,使磁极装配间隙降低,质量得到持续提升和明显改观。
Large-scale pumped storage units have the characteristics of fast speed,high manufacturing accuracy,and complex operating conditions.The magnetic pole adopts a centripetal tower structure to eliminate side tension.The high standards of manufacturing and assembly bring unprecedented challenges to the traditional process.For the problem handling and process control of a large magnetic pole,an effective process plan is proposed to reduce the magnetic pole assembly gap,and the quality is continuously improved and significantly changed.
作者
王嫦美
杨悦伟
张翔
WANG Changmei;YANG Yuewei;ZHANG Xiang(Dongfang Electric Machinery Co.,Ltd.,618000,Deyang,Sichuan,China)
出处
《东方电气评论》
2022年第3期64-66,75,共4页
Dongfang Electric Review
关键词
大型抽水蓄能
向心塔形磁极
装配间隙
质量提升
large pumped storage unit
centripetal tower pole
assembly clearance
quality improvement